PROJECT1: Electromechanical Rehabilitation and Maintenance of Three Mobile Pumps

  • image
  • image

PROJECT DESCRIPTION

The works are primarily including the following:

  • Supply, test and install wet prime trash pump produce 120 m3/h at total head 25 meter.
  • Supply, test and install wet prime trash pump produce 250 m3/h at total head 25 meter.
  • Supply and install suction and delivery hoses with different diameters.
  • Client: UNICEF
  • Owner: CMWU

 

 

PROJECT2: Lot 1 – CMWU /O&M maintenance W-WW facilities 2018 in all Gaza Strip

  • image
  • image
  • image
  • image

PROJECT DESCRIPTION


This project consists of:

  • electromechanical rehabilitation, repair and upgrading sewage pumping stations and water treatment facilities
  • electromechanical rehabilitation, repair and upgrading water wells, pumping and treatment facilities
  • maintenance of electrical installations

In addition, the contract includes supplying and installing wastewater submersible pumps at Nusirate PS and Hesbit Al Samak PS – Khanyounis, and supplying and installing Chlorine Disinfection/Dosing system at different sites

Similar Projects:

  1. Electromechanical l rehabilitation repairs and upgrading of 15 wastewater pumping station
  2. Emergency Rehabilitation and Refurbishment of Water Production Wells and Pumping Facilities in Gaza Strip
  3. Repair Rehabilitation of Water Tanks and Booster Stations in Middle and southern Area –package2