The works are primarily including the following:
- Supply, test and install wet prime trash pump produce 120 m3/h at total head 25 meter.
- Supply, test and install wet prime trash pump produce 250 m3/h at total head 25 meter.
- Supply and install suction and delivery hoses with different diameters.