PROJECT1: CMWU /Rehabilitation works at El Rahma water booster station

  • image
  • image
  • image

PROJECT DESCRIPTION

This project consists of:

  • supply and installing two vertical turbine water pumping sets with total capacity 600 m3/h, including 24″ suction barrel with 9 meter depth for each pump.
  • supply and installing two vertical turbine water pumping sets with total capacity 500 m3/h, including 24″ suction barrel with 9 meter depth for each pump.
  • upgrading of the existing electrical control panel

 

  • Client: ICRC
  • Owner: CMWU

 

PROJECT2: Electromechanical refurbishment and upgrading of Abasan Kabira water booster station

  • image
  • image

PROJECT DESCRIPTION

The works are primarily including the followings:

 

  • Construction of three vertical turbine pumps with total capacity 450 m3/h at 45 m total head
  • Construction of 280 mm diameter UPVC water carrier pipe line
  • Construction new water well and connecting to the existing concrete water tank

Similar Projects:

[table id=1 /]