PROJECT1: CMWU /Rehabilitation works at El Rahma water booster station

  • image
  • image
  • image

PROJECT DESCRIPTION

This project consists of:

  • supply and installing two vertical turbine water pumping sets with total capacity 600 m3/h, including 24″ suction barrel with 9 meter depth for each pump.
  • supply and installing two vertical turbine water pumping sets with total capacity 500 m3/h, including 24″ suction barrel with 9 meter depth for each pump.
  • upgrading of the existing electrical control panel

 

  • Client: ICRC
  • Owner: CMWU

 

PROJECT2: Electromechanical refurbishment and upgrading of Abasan Kabira water booster station

  • image
  • image

PROJECT DESCRIPTION

The works are primarily including the followings:

 

  • Construction of three vertical turbine pumps with total capacity 450 m3/h at 45 m total head
  • Construction of 280 mm diameter UPVC water carrier pipe line
  • Construction new water well and connecting to the existing concrete water tank

Similar Projects:

No.DescriptionsProjectClient
1QTY (7) SMI VTP each capacity 1000 m3/h @ 52 mEl Sheikh Redwan booster pumping stationMunicipality of Gaza
2QTY (3) SMI VTP each capacity 335 m3/h @ 23 mBani Suhaila Booster pumping stationCMWU
3QTY (15) SMI VTP each capacity 150 m3/h @ 85 mRecovery Water WellsPWA
4QTY (1) SMI VTP each capacity 70 m3/h @ 85 mKhadija water well pumpUNDP
5QTY (1) SMI VTP each capacity 60 m3/h @ 120 mEl Montazah Water wellCMWU
6QTY (2) SMI VTP each capacity 70 m3/h @ 120 mEl Tahliya Water wellCMWU